Triolion Tech helps Zhongyuan Express to achieve intelligent monitoring
Triolion Tech helps Zhongyuan Express to achieve intelligent monitoring
Sep 9, 2019
Share:

Triolion Tech helps Zhongyuan Express to achieve intelligent monitoring

    The Zhengzhou Branch Transportation Management Center was established in January 2008. It is located at the entrance of the Zhengzhao Toll Station at the entrance of the Zhengzhou-Zhongzhou Expressway and the Zhengzhou Branch (the intersection of Nansihuan and Huangguo Road, Erqi District, Zhengzhou City, Henan Province). Shishi Expressway Houzhai Toll Station). There are monitoring sub-centers and tunnel management offices, which are responsible for monitoring the daily supervision of the sub-centers and tunnel management offices. The transportation management sub-center is about five kilometers away from the provincial capital Zhengzhou city center. The geographical position is superior and the transportation is convenient.
The large-screen projection system of Zhengzhou High-speed Zhengzhou Management Sub-center was completed and put into use on December 1, 2007. The system has been running for more than 10 years, and the usage time is close to the life cycle of the large-screen system. At present, due to serious equipment aging, core equipment is out of production, maintenance cannot be performed, and the current equipment has been discontinued. The project will update and renovate the large-screen system according to the actual needs of the Zhengzhou Sub-center.
The monitoring hall is set up on the second floor of the monitoring sub-center. It covers an area of 408.24 square meters, is 25.2 meters long, 16.2 meters wide and 6.3 meters high. The front of the hall is a large screen, which is composed of a full-color LED small-pitch display. It is a red and yellow two-color LED screen.
The monitoring sub-center is a comprehensive system project integrating high-tech such as computer network and closed-circuit television. According to the relevant principles of highway traffic engineering control, through the monitoring of traffic operation of the whole road section, the macro management of the whole line traffic operation and Scheduling.
The monitoring sub-center collects the traffic information of the road section collected by the external field equipment and the operation status information of each external field equipment, and uses the system software to analyze and calculate various data, parameters and conditions, and timely reflect various abnormal conditions, and The information board publishes information, and through the large-screen projection system and the closed-circuit television system, the actual situation of the highway and various key parts of the project is reflected, visually and intuitively, for the operator to refer to during the decision-making. The management department can really monitor and control the operation of the expressway of the project through the monitoring system to ensure the safety and smoothness of the road.